Collect the lift information
Confirm the vehicle, equipment, load, site and proposed method.
ALLMI Appointed Person support
Practical lift plans, risk assessments and safe systems of work for lorry-loader operations within the agreed scope of competence.
The service
A useful lift plan must reflect the actual vehicle, lorry loader, accessories, load, ground conditions, radius, exclusion zone and site constraints. Generic paperwork is not a substitute for proper planning.
How it works
Confirm the vehicle, equipment, load, site and proposed method.
Review capacity, radius, setup, accessories and site constraints.
Produce the lift plan, risk assessment and safe system of work.
Ensure the plan is communicated and changes are reassessed before the lift.
Common warning signs
One warning sign does not automatically mean the whole operation is failing. Repeated signs, missing evidence or weak management response deserve prompt review.
The load weight or centre of gravity is uncertain
The drawing does not match the actual site
Outrigger loads and ground conditions have not been considered
Accessories or lifting points are not confirmed
The driver is expected to improvise on arrival
The scope changes but the lift plan is not reviewed
Useful official guidance
These links are provided as useful starting points. The applicable requirements depend on the licence and operation.
Questions about allmi appointed person support
Attendance depends on the complexity, risk and agreed scope. Some plans can be prepared from verified information; others require a site visit or further competent input.
No. A plan does not replace trained and competent operators, suitable equipment, pre-use checks or site control.
A standard plan may be possible where the equipment, load and site conditions genuinely remain within defined limits. Variations still need to be assessed.
The preferred generic term is lorry loader. HIAB is a manufacturer name and may not describe every item of equipment.
MV is based near Manchester and supports operators across Greater Manchester and the wider North West. ETM appointments depend on travel time, availability and the requirements of the specific licence; audits and project work can be delivered across a wider area.
UK-wide lift-planning support
Where the load, equipment, configuration and site conditions can be evidenced clearly, lift plans, lifting risk assessments and SSOW can be prepared remotely. Complex or uncertain sites may require attendance. Any mileage, travel time and accommodation is agreed before the visit.
Straight answers. Practical action.
Practical lift plans, risk assessments and safe systems of work for lorry-loader operations within the agreed scope of competence.